Pioneer
Aeronautics

Project
Highlights

This state-of-the-art aerospace manufacturing plant, constructed by DAC for Pioneer Aeronautics, is comprised of two different building types joined together — a wood-based office space, and a pre-engineered metal manufacturing facility. The single-level office space is finished with gypsum board and alder trim throughout the interior, with masonry and rough sawn lumber making up the exterior. The Varco Pruden manufactured metal building is skinned with Kingspan insulated siding and roofing panels to maximize energy and improve insulation. The whole of the project was designed with expansion in mind — thanks to some strategic planning with the owners and designers, we were able to generate a result that will be repeatable many times over.
Project Facts
Completed: August 2014
Contract: $4.7 Million
Square Feet: 33,380 Total
Project
Features
Pre-engineered metal building (PEMB)
Energy-efficient design
Epoxy-coated, chemical-resistant floor
Testimonials
I am very pleased with the final product which Chanen Construction was instrumental in delivering, and I am more than satisfied with their work as a general contractor.
Claremont Lincoln University - President
The added safety that this new tile will afford the casino will show in the lessening of slips and falls and employee injuries...thanks again for the quick, professional, and safe way that this project came off.
Casino Client - Kitchen Remodel
Related Projects
Let's get
to work
The team at Dick Anderson Construction has never been stronger, and we bring our exceptional skills, experience and commitment to quality to every project. Though our talented employees come from diverse educational and technical backgrounds, they share common traits – working hard to meet or exceed client expectations, paying attention to detail, and showing integrity in all they do. That’s The DAC Way.