Moonlight Lower
Bridge

Project
Highlights

The bridges were installed to connect the Holy Grail Ski Trail from Ulery’s Lodge to the Madison Village in Moonlight Basin.

Project consisted of two bridges, being Upper and Lower.

Upper Bridge Approx. 170’ in length Lower Bridge Approx. 280’ in length.
Project Facts
Completed: November 2020
Project Budget: $1.7 Million
Length: 170 ft Upper Bridge - 280 ft Lower Bridge
Sustainable
Features
18” concrete spread footings
36” diameter concrete abutments and piers
Corten steel superstructure and handrailing
Testimonials
Their professionalism, attention to detail, and quality and cost-saving measures certainly produce happy clients and make all of us look good.
DWL Architects - President
I am very pleased with the final product which Chanen Construction was instrumental in delivering, and I am more than satisfied with their work as a general contractor.
Claremont Lincoln University - President
Related Projects
Let's get
to work
The team at Dick Anderson Construction has never been stronger, and we bring our exceptional skills, experience and commitment to quality to every project. Though our talented employees come from diverse educational and technical backgrounds, they share common traits – working hard to meet or exceed client expectations, paying attention to detail, and showing integrity in all they do. That’s The DAC Way.