Boeing
Building

Project
Highlights

DAC was commissioned by Boeing to lead construction on their building 74-320 — a new 60,850 square foot addition to the company's manufacturing facility in Helena. The building is primarily additional manufacturing space, with included equipment rooms , storage rooms, and office space. The building's structure is a manufactured metal building by Nucor Building Systems. The building envelope is typical, with a metal siding wall assembly, blanket insulation, vapor barrier, and full height metal liner panels, The roof consists of vertical seem roof panels, blanket insulation and vapor barrier. The foundations are SNK Milling Equipment Foundations. Boeing installed three 5-ton bridge cranes and two 7-ton bridge cranes over the manufacturing space, along with a full area floor covered with a high performance floor coating.
Project Facts
Completed: October 2014
Contract: $11.75 Million
Square Feet: 60,850
Project
Features
Bridge Cranes
5
Full-metal Construction
High-performance floor coating
Testimonials
I am very pleased with the final product which Chanen Construction was instrumental in delivering, and I am more than satisfied with their work as a general contractor.
Claremont Lincoln University - President
The added safety that this new tile will afford the casino will show in the lessening of slips and falls and employee injuries...thanks again for the quick, professional, and safe way that this project came off.
Casino Client - Kitchen Remodel
Related Projects
Let's get
to work
The team at Dick Anderson Construction has never been stronger, and we bring our exceptional skills, experience and commitment to quality to every project. Though our talented employees come from diverse educational and technical backgrounds, they share common traits – working hard to meet or exceed client expectations, paying attention to detail, and showing integrity in all they do. That’s The DAC Way.