Project
Highlights
A Chanen joint venture managed the design and construction of the largest terminal in the sixth busiest airport in the U.S. Although a significant number of tenant-requested design changes were made late in the design phase, the project management team was able to minimize the delays and maintain the original construction schedule. Under a separate contract, Chanen also designed and built the America West Airlines concourses, gates, and baggage handling system.